The Amazing Steel Structures of Millennium Park. Written by George F. Wendt

Years before completion of Chicago's amazing Millennium Park, Chicago Metal was consulted regarding bending pipes for a massive trellis designed by Frank Gehry.

Downloadable Document

The Amazing Steel Structures of Millennium Park: The Pritzker Pavilion, Cloud Gate, The Nichols Bridgeway, The Modern Wing of the Art Institute of Chicago, The Burnham Pavilions and The BP Bridge

By George F. Wendt, Chicago Metal Rolled Products

The 1998 Millennium Park plan replaced unsightly parking lots and working railroad lines with an underground parking garage capped by a green park and bordered by a cliff wall of buildings to the west and north, parks and the lake to the east, and the Art Institute to the south. (Is this the world’s largest green roof?). Creating this 25.4 acre park also fulfilled Burnham’s 1909 plan to extend Grant Park to the north. The gift of a music pavilion from the Pritzker family, however, began a chain reaction that would transform the park from a ho-hum repeat of grass and flowers into a treasure trove of world-class art and architecture including some spectacular steel structures. Not surprisingly, these steel forms presented significant design, fabrication and erection challenges. This guide celebrates the achievements of all those who helped create these marvelous metal structures.

Starting at the northwest corner of the park, proceed east to the Pritzker Pavilion.

The Pritzker Pavilion: Tresses and a Trellis

Talk about a challenge! Architect Frank O. Gehry’s signature curvilinear elements soar 120 feet in the air while cantilevering 130 feet from the stage. (A cantilever is a structural element supported on only one end—think diving board.) Skidmore, Owings & Merrill (SOM) engineers calculated not only the forces of the wind on these “sails” but also the rigidity required to avoid wind-induced flutter. A criss-crossing network of tube and beam struts and trusses anchored in concrete provides the mountings for the stainless steel cladding of the sails. 3-D modeling using CATIA software established a spatial grid work to guide LeJeune Steel, the fabricator of the supports. A. Zahner Company also used this software to cut the shingles each of which is different. All the curves in the elements are actually composed of segmented straight sections. Alternately referred to as a “massive, metal headdress;” “a bow of curled ribbons on a gift box,” and “a flashy, silver lion with an unruly mane,” this band shell with its curlicue tresses functions as the focal point for the 11,000 viewers who can enjoy each free concert in the park.

Gehry also designed a silver trellis of 12, 14, 16, 18, and 20 inch diameter pipe from which to hang speakers without obstructing anyone’s view and to create a “room” which is the size of four football fields for the concerts. A system which delays the sound by milliseconds as it is distributed mimics the sound of a concert hall.

Gehry’s original trellis model had pipe curved with multiple radii and in two planes. Thanks to the opportunity for early involvement with the design team, Chicago Metal Rolled Products suggested bending in one plane and changing radii only at the nodal junctions. Gehry and SOM agreed and decided to tip each arc on its side. John Zils of SOM said these suggestions were a “major breakthrough from a fabrication and cost-reduction standpoint.” On one of the largest bending machines in the world, Chicago Metal bent all the pipe to a curvature within 1/8 inch tolerance over 20 feet.

The trellis is 625 ft. long, 325 ft. wide, and 60 ft. at its highest point; the radii range from 100 to 1000 ft. Twenty-four arches, one flatter and one steeper, spring from each pylon and land on pylons “downstream” on the other side. Intersecting arches meet on the same surface but at different angles.

All fabrication called for Architecturally Exposed Structural Steel (AESS) quality, technology to curve 570 tons of large pipe affordably without distortion, a timely delivery (e.g. expediting the X node where the trellis meets the elements above the stage), and precise fabrication of the nodal junctions by Acme Structural, the structural steel fabricator.

Danny’s Construction erected both the trellis and the stage using cranes and 78-foot-tall shoring towers. The towers allowed for subtle location adjustments and welding of all the structural sections for the trellis.

The crane required for the pavilion was so large that it had to be disassembled on Columbus Drive, lifted onto a mat that would transfer the load to reinforced columns in the parking lot below, and then reassembled.

After erecting the stage, when the supports were removed from the uppermost pieces of the headdress, the vertical deflection was only 3/8 of an inch—a tribute to the design, fabrication and erection of the pavilion. Moreover, due to construction restraints, the trellis was built simultaneously from the north and from the south and still fit up perfectly.

The trellis defines the space, supports the speakers, and is one with the work of art that is the Pritzker Pavilion.

Proceed south along the Pritzker Pavilion until you see Cloud Gate (aka “The Bean”) on your right.

Cloud Gate: Liquid Mercury

Artist Anish Kapoor ‘s complex shape called for a mirror finish that would reflect the city, the lake and viewers as they walk up to the cloud-reflecting sculpture, pass through the “gate” and discover their own reflection in the “belly button” of the cloud shapes. Performance Structures, Inc. (PSI) of California, with the help of MTH of Chicago, accepted the challenge of fabricating and erecting this 30 ft. high, 60 ft. long, 300 ton sculpture, one of the largest in the world.

PSI formed 128 car-sized plates within 0.01 inch of the required dimension on a device similar to ones used to form fenders on automobiles. The plates were then welded to trusses to hold their form for the trip to Chicago. Because the assembled structure would be too heavy to move over the parking lot, the majority of the welding had to be done on site. In fact, a 30,000 pound steel frame about 14 inches below where you stand spans the Park Grill, underground parking, and rail road tracks to support this work of art.

The relatively thin shell of the structure—1/4 to 3/8 thick--is actually suspended on two giant rings mounted on vertical beams arising from the underground steel frame. Like pant suspenders, springs, struts and cables attach the plates to the rings resulting in 0/0 clearance: the plates came together with a closed edge. Hung this way, the shell does not have to support its own weight.

The structure was assembled on the jobsite with an elaborate rigging system that supported the internal trusses, the plates, and even the erectors, welders and polishers.

The full-penetration, plasma weld seams had to be done from the outside. A flexible track with suction cups guided a traveling torch to cut a keyhole through the abutting pieces. As a mechanism feeding wire followed into the heat zone, the wire melted and then became the weld joint. To shield the weld, a channel on the back side of the plates was filled with gas during the process. The curvaceous shape required all-position welding in the same run: meaning its right in front of you, vertically up, vertically down and overhead. Because the welding process tends to pull the adjoining plates inward, the engineers developed a process of pushing the edges of the plate a few thousands of an inch out resulting in a smooth seam with no indentation.

The fabricators and erectors developed a 12 step process to bring the 316L stainless steel with a 2B finish to a Mirror #8 finish. Each square foot of surface required 12 to 14 hours of grinding and polishing. When the park opened, the seams were barely visible, but the final polishing had not been completed. The sculpture has been vandalized 5 times and unintentionally scratched a few times. MTH repairs the damage.

The sculpture can be accessed through the top of the omphalos, the raised structure within the base of the “bean.” While under the structure look carefully and you might see an approximately 3-foot-diameter ring in this “belly-button of the belly-button.” Battery-powered devices inside measure the temperature and strain of the sculpture. As of a year ago, no significant movement was detected. Engineers also considered using various frequencies to keep pigeons away but abandoned the idea when it was discovered that these frequencies might actually damage the welds.

Nobody doesn’t like “The Bean.”

Proceed to Nichols Bridgeway

Nichols Bridgeway: Architecture that Rises to the Level of Art.

Nichols Bridgeway rises with a 5.6%, ADA-compliant slope from deep in the park to connect 60 feet above grade on the third floor of the Modern Wing of the Art Institute and will help drive traffic to a new restaurant and sculpture terrace on the roof as well as to the museum itself. The 15-ft-wide walkway with LED lights under the handrails will be heated in winter to remove ice and snow. The bottom of the bridge is up lit.

Renzo Piano designed both the bridge and the museum. A stark contrast to Gehry’s snaky bridge which we will see later, this structure is modeled after a sleek racing yacht: both ends of the bridge are shaped like the prow of a ship. The steel structure is a box truss with a curved bottom steel plate covered by a soffit plate that is also structural. Plate stiffeners inside connect the flat top with the curved bottom. On a very heavy plate roll, Chicago Metal Rolled Products curved 112 pieces of 3/8 and 5/8 thick plate to a 10 foot radius in sections as wide as 12 feet and from 12 to 18 feet long taking great care with polished rolls and nylon slings not to scratch any surface.

A 10-foot-long mockup was hoisted to where the bridge would meet the Modern Wing so that the architect could study its appearance including the welded and bolted seams. Piano approved the bridge section after viewing in the daytime and up lit at night. Industrial Steel Construction then fabricated 8 bridge sections in a manner to conceal the weld splices while also creating a 2000-foot-radius camber. Engineers from Ove Arup & Partners also calculated that the thermal movement of the 620 ft. long bridge would be 2-1/2 inches in either direction and designed the five supports in the park accordingly. Sections from 70 to 90 foot in length were then fabricated and shipped to the jobsite. The longest span crossing Monroe is 200 feet.

With both gantry and truck cranes, Danny’s Construction erected the bridge which never simply stands on the ground but rather sits on columns above a parking lot, a bus way and train tracks as well as hanging onto the museum addition by two cantilevered beams. It took 3 to 4 months to plan the 3 hour lift. Placement of the 110,000 pound section crossing Monroe St. required that the truck crane be located below Monroe on the bus way.

The bridge rises to the level of art by leading to the Art Institute and by being a work of art itself. Since May, hundreds of thousands of people have walked up this structure.

While enjoying the views of the city, the park, the lake and especially the new addition to the Art Institute, walk up the bridge, enter the museum, proceed to the terrace and an overview of Millennium Park.

Modern Wing of the Art Institute of Chicago: The Light Fantastic

In 1999, Renzo Piano was hired to design a 75,000-square-foot addition over the railroad tracks on the south campus of the Art Institute of Chicago. But with the explosion of activity at Millennium Park—the music pavilion, Cloud Gate, the BP Bridge, the Harris Theatre, etc.—and with the departure of the Goodman Theatre on the north side of the museum, in 2001 Piano ended up designing a 264,000 square foot addition on the opposite side of the Art Institute providing more than three times the space of the original plan.

While designing the Modern Wing, Piano experimented with scale and proportion with his two Excelon Pavilions at the south end of the park facing the museum. These pavilions—each subtly different-- represent mini-facades for his design of the museum addition and provide access to the parking garage below.

Renzo Piano’s design is composed of glass, steel and limestone which matches the stone of the existing museum. Most art museums do not have much glass because of the harmful effects of sunlight on precious art. Piano addressed that concern by hanging a “flying carpet” above skylights to filter light and eliminate the threat to the art. This sunshield supported by steel columns above the third floor is composed of extruded aluminum fins precisely angled to collect and redirect natural light from the north. Additional screening and computer adjusted electrical lighting achieve the ideal combination of appropriate lighting, reduced electrical expenses, and art preservation.

While other architects might use heavier construction to make their structural statement, Piano’s airy, lightweight design with meticulous attention to detail succeeds in his own way. Notice the extremely thin steel pipes tapered at the top and bottom with connections to support the “flying carpet.” The glass roof of the top-floor galleries is further supported by delicate steel trusses. Piano is guided by a “zero-gravity” concept with details that suggest that everything is floating: a small reveal on the bottom of stationary and moveable walls, and on benches; the suspended staircases; and a complex double façade all contribute to the effect.

And the glass wall on the north end of the museum offers enticing views of the park and city that would otherwise be unavailable to the public. Construction System, Inc. fabricated the steel, Area Erectors erected the building, and Ove Arup & Partners were the engineers. The bridge, the park and the museum operate in a symbiotic relationship creating architecture that truly rises to the level of art and allows the exhibition of gallery art not previously seen because of space constraints.

You can proceed to the museum, take the escalators down to the street level and return to the park, but that would entail walking either to Michigan Avenue or to Columbus Drive and crossing a busy intersection. Unless you’d like to dine at and/or visit the museum, I suggest you walk down the bridge and proceed to your left to visit the Burnham Pavilions.

Burnham Pavilions: Bold, Sustainable Forms

A bold marriage of steel and fabric in the complex geometry of Zaha Hadid Architects honors the bold plans for Chicago that Burnham made 100 years ago. The Pavilion can be disassembled and re-installed at another location following the Centennial celebration. A tensile fabric cover created by Fabric Images is supported by more than 7,000 pieces of aluminum, with no two alike, welded together to create the curved form.

Supported by a steel frame, the UNStudio pavilion, will be de-constructed and recycled when its exhibition is complete. Steel is the most recycled material in the world. Check out the interesting views of Chicago architecture as seen through the floating roof.

Exhibit panels adjacent to the pavilions explain the ideas and motivation behind the Burnham Plan Centennial. A touch screen allows visitors to make choices about our quality of life now and into the future by interacting with the Chicago Metropolitan Agency for Planning's (CMAP) regional GO TO 2040 plan.

If you haven’t see the Crown Fountain, you might want to walk a little south from the Burnham Pavilions to view this wonderfully interactive work of art. (Isn’t everything in this park wonderfully interactive?)

Walking along the back of the Pritzker Pavilion, proceed to the east side of the park. and the BP Bridge

BP Bridge: Curves Galore

Like the Pavilion, Gehry’s bridge design—his first ever--went through at least 10 iterations, at times to please the aesthetic tastes of Mayor Daley. The mayor was concerned that the bridge would draw attention away from the music pavilion. Even Gehry admitted his early designs looked “horrible.” The final product serves both as a bridge and as a berm to muffle the ambient noise from busy Columbus Drive.

The long sinuous design allows for a gentle 5% incline while not taking up too much real estate connecting Millennium Park to Grant Park and the lake. Notice that there are no handrails, only side walls to protect pedestrians. The bridge is comprised of three different structural systems. Reinforced concrete walkways and piers on either side of the street anchor two cantilevered steel trusses incorporating 20 inch diameter pipe with a 2 inch wall that is curved. The curving process was heat induction bending: after heating, a 2 inch length of pipe is mechanically bent, cooled and advanced to heat and bend the next 2 inches.

Littel Steel did the fabrication which was made easier when SOM provided all the center-line dimensions, measurements not always provided on a Gehry project. Connecting to the cantilevered trusses is the third element: a 6 foot wide, 3-1/2 foot deep box girder with a curved underside. Supported by the cantilevered sections and a concrete center pylon in the middle of Columbus Drive, this member carries the load. Outriggers welded to the box girder cantilever widthwise to form secondary structures for the skirts on the bridge. The relatively thin bridge incorporates plate as thick as 1-1/2 inch to achieve its aesthetically pleasing shape.

Gehry’s signature style is again expressed in 9,406 stainless steel shingles fabricated by Permasteelisa Cladding Technologies and attached with 132 steel studs from Radius Track. This bridge also provides drop-dead view of the city, the parks, and the lake as well as a view of the struts that support the headdress above the Gehry pavilion. Imperial Construction Associates erected the bridge over Columbus Drive in a single weekend, with two welded air splices performed in the field.

Gehry’s bridge is 925 feet long, 14-1/2 feet high; Piano’s is 620 feet long and 60 feet high. Gehry’s is a winding snake; Piano’s a sleek racing yacht. Gehry’s rises up and then returns to grade level; Piano’s is a steady incline only. Both offer drop-dead views of the park and the city. Gehry’s complements his pavilion and trellis; Piano’s his Modern Wing. And Piano deliberately designed his bridge as a direct counterpoint to his friend’s.

Both provide an exhilarating experience for any visitor.

SUMMARY

Donors, the City of Chicago, the Art Institute of Chicago, architects, engineers, structural steel fabricators, specialty subcontractors, and erectors—thousands of individuals—collaborated to meet the challenges of designing, fabricating and erecting these amazing steel structures. Teams created the structural underpinnings to support the loads above the garage, the railroad tracks, the bus way and even a restaurant. Further complicating issues of weight, moving very heavy pieces required big machines which are heavy themselves.

A considerable amount of construction was completed not in a controlled, shop environment but in the middle of downtown Chicago with its busy pedestrian and vehicular traffic. And much of the work was done within a fully functioning park.

One example is typical of preparation and execution required to build the steel structures of Millennium Park: over 100 metal fabricators, cutters, welders, finishers, engineers, technicians, ironworkers, erectors and managers worked for five years to create Cloud Gate. In 110-degree heat, wearing protective suits and respirators, hanging from harnesses in a tent on the job site, skilled craftsman polished the mirror we lovingly call “The Bean.” Those of us who enjoy this park owe a debt of gratitude to all who contributed.

From the BP Bridge, proceed to your final destination. I hope you enjoyed the tour.

George Wendt, Chicago Metal Rolled Products, cmrp.com

Remember: “There’s always a solution in steel.” AISC.org

Our work TESTIMONIALS
  • "A big thank you to your team. Your parts are receiving the most positive feedback possible. Your company has new fans here."
    Bruce E., Kansas
  • "Without CMRP able to roll these channels to my specifications, there was no way this beautiful round antenna would have ever worked. 
    Damon S., Wisconsin
  • "My customer has installed several truckloads worth of 36" x 160# WF beams you rolled and cambered for us. The quality is spot on."
    Justin J., Alabama
  • "The rolled stringers were right on the button as far as pitch and radius."
    Bob O., Illinois
  • "I really appreciate your company coming through on this order & expediting the material when you said you would.You stick by their word."
    Jason R., Missouri
  • "The last order of rings were the best that we have received from you. The flanges were all flat. Keep them coming like that."
    Lenny P., Ohio
  • "Thanks for OVER AND ABOVE EXCELLENT SERVICE.  The quality and accuracy of CMRP's work is outstanding"
    Peggy, Texas
  • "The ring looks good! The OD is dead on. Thank you for your concerns regarding our questions and responding so quickly. I was impressed!"
    Fran Z., Pennsylvania
  • "Please pass on to the workers, . . . (your) rings . . . were some of the best our fitter has seen."
    Jeff K., Illinois
  • "I want to thank CMRP for exceeding what you promised. You are ahead of schedule and the strakes are fitting great."
    Jim A., New York
  • "Your advice was a significant contribution to the project.  You provide excellent service and knowledge"
    John Z., Illinois
  • "These pipes were rolled DEAD ON. The shop guys said they had never seen a pipe come in and hit every point like that in a long long time."
    Joe C., Missouri
  • "The rolling on these rectangular tubes was absolutely perfect! Barely any adjustment needed to be made."
    Tom G., Massachusetts
  • “We just placed an order for Rolled Angle Rings & you delivered them to us within 2-1/2 days ... we are three states away.”
    Jim S., Pennsylvania
  • “I would like a quote on a spiral project. I have heard many good things about your quality and timeliness from other fabricators.”
    Ryan L., Utah
  • “The rolled beams were delivered yesterday and look very good. Thank you for great service!”
    Thomas S., Maine
  • “I’ve worked with CMRP for over 16 years and can rely on them for any size job and in any time frame. CMRP delivers every time.”
    Mindy, H., Indiana
  • “It is unbelievable how good a job you guys did rolling these beams.”
    Richard G., Canada
  • “You all helped us out greatly when no one else seemed they could. Everything worked out wonderfully!”
    Cliff P., Florida
  • “The parts are very impressive and the service was stellar. I will certainly be recommending you to anyone needing such services.”
    Randy W., Georgia
  • “We got everything we needed in a very short turnaround, I appreciate it.  We are happy to have a reliable source to turn to.”
    Russell P., Illinois
  • “Quote was great! Timely, appropriate, and frankly less money than we expected.”
    James L., New York
  • “CMRP immediately took action and shipped out my order the same day! This all happened like clockwork, allowing us to meet the deadline.”
    Margo R., Ohio
  • “We only use CMRP for our rolling needs. We can always depend on getting a finished product that is to our expectations or better.”
    David P., New York
  • “I wish everyone could get quotes back that fast! That is why we use you, fast response to quotes and questions and great quality!”
    Will F., Indiana
  • “Your quotes are always so well organized and thorough, I trust your work.”
    Jessica, South Carolina
  • “On larger more complex rolling items, I typically only go to Chicago Metal Rolled Products for pricing due to quality.”
    Kevin H., Pennsylvania
  • “Thanks for providing the material. First two sets were laid out and fabricated. Radius was excellent!”
    Brad, Iowa
  • “We really appreciate your work on this. Amazing attention for a smaller sized job. Thank you for coming through.”
    Erik J., New York
  • “The project was AMAZING! Thank you so much for your help. I really do appreciate it. Always a pleasure doing business with you.”
    Kelly E., Iowa
  • “Your salesman provided a quick quote with an offer to explain things we should take into account. It's known you guys do the best work.”
    Mark R., Maryland
  • “Thank you for your help with the project and for getting everything complete and shipped out in a such a timely fashion. You guys saved the day.”
    Ben B., Florida
  • “You guys did an amazing job on these stringers. We would NOT be having such a success story without your team's effort & patience!”
    David B., Oklahoma
  • “You gave me excellent service and help which I appreciated very much. Material was on time and right on spec.”
    Brian S., Pennsylvania
  • “Your positive attitude is noted & CMRP reputation in the steel industry is impressive. All of our locations will contact you in the future.”
    Dave B., North Carolina
  • “My boilermakers in the field had positive things to say about the quality and accuracy of the angles that you rolled. Thank you.”
    Walter L., New York
  • “The project is complete and our customer is very pleased. I appreciate your diligence and quality on this one.”
    Dusty A., Texas
  • “CMRP has been instrumental in our ability to deliver high quality & great looking parts. Any job, big or small, CMRP has come through.”
    Eddie C., Kansas
  • “Your rolled steel worked great! We check lengths & chord dimensions ...everything was within an 1/8".”
    Don L., Michigan
  • “We received our order on time and the level of workmanship is excellent!"
    Roger R., Georgia
  • “Your company did a great job rolling these parts. Our fab and installation is going very well thanks to the quality of your work."
    Ronnie S., North Carolina
  • “Your company is the only one that was able to give me a quote that was right on with my specs, everyone else had to modify at least one dimension."
    Adam S., Minnesota
  • “Thank you for the follow through & turn around time, it greatly helps in the environment that exists today."
    Don F., Nevada
  • “This was our first experience with your company & I was very impressed with all aspects."
    Rick N., Minnesota
  • “I want all to know your hard work and efforts have not gone without appreciation."
    Lance B., Minnesota
  • “The accuracy and quality of your product put a smile on our foremans face - that is hard to come by."
    Jonathan S., New York
  • “Competitive price. Beat the schedule. No complaints from the project site."
    Lane K., Florida
  • “We appreciate you working with our tight schedule and overdelivering on this project."
    Alyson M., Texas
  • “The rolled segments were perfect and priced right. We will definitely use you again."
    Joe M., Nebraska
  • “Your group is awesome to work with and greatly appreciated!"
    Tammie N., Kansas
  • “You did EVERYTHING correctly. That's why you guys are the best in the business!"
    Walt W., Florida
  • “It was very impressive to get such rapid service and a great product."
    Jeff L., Pennsylvania
  • “Very impressed with your speed and overall service!"
    Brian W., Iowa
  • “Great service, product looks good, arrived a day early. Thank you!"
    David C., New York
  • “Your work, as always, near perfect, timely, and accurate. Exactly the same for the last 40 years."
    Pat M., Wisconsin
  • “Absolutely fantastic job by your guys! The fit of the two parts in AWESOME!"
    Kenny R., Florida
  • “The other guys were off by 3/4", CMRP spot on. We won't even question where to send our rolled plates in the future."
    Brant M., Illinois
  • “Your guys responsiveness is way better than any vendor that I have ever dealt with!"
    Jay W., Minnesota
  • “I always appreciate your continual positive attitude even in some difficult situations."
    Christopher L., Illinois
  • “We could not be happier with the parts and customer service you and your team provided. We have never been disappointed."
    Rodney H., Virginia
  • “What an amazing first time experience!! Couldn't be happier!."
    Jason S., Indiana
  • “We consider your company to be one which we can always count on to be on time and accurate."
    Andre T., Missouri
  • “It was very easy working with your company. I will recommend your company to others."
    Jim R., Illinois
  • “You handle all of our orders quickly and efficiently. Working with you is a joy!"
    Patti W., Texas
  • “Pieces fit like a glove"
    Mark F., New Jersey
  • “Customer service is important to us and you hit the mark! It has been a pleasure."
    Dan P., New York
  • “Couldn't be happier with both the order and how quickly you processed everything. Very happy!"
    Dan M., Texas
  • “The rolled plates & tube laser parts are perfect - having the plates rolled without any pickup, & ends meet up on true verticals is HUGE!"
    Jim M., New York
  • “High praises on the work you folks did. It's nice to know you guys are around."
    Peter B., Illinois
  • “Your superior service and quality are unmatched. This is not a cliche."
    Ted S.,Indiana